HMP Littlehey, Cambridgeshire
Two new rapid-build prison houseblocks.
Each houseblock, situated adjacent to each other, contains 120 single occupancy cells, with en suite facilities, housed over two floors.
Built off-site by Britspace in their Yorkshire based factory, the flexibility of the design allows off-site construction benefits to be maximised to take as much work as possible away from the site.
← previous
next →