3e were involved with Wm. Morrison Supermarkets Plc and Bowmer and KIrkland Ltd to build a 74,500 sq m warehouse alongside the M5 motorway.

The project included a desk study and site investigation, which revealed extensive thicknesses of weak alluvial soils and high groundwater levels. Pre-loading of soils was chosen to accelerate settlements prior to construction and avoid potential damage to the floor slabs with piled foundations used. The proximity of a main line railway and its potential for settlement required consideration during the development.

Ground gas monitoring enabled the design of appropriate gas protection measures for the development.

NEWS

** Exciting News - Newcastle Office Relocation **

Due to ongoing success within the Newcastle office we are pleased to announce 3e have moved to new premises with effect from the 19th July 2018.  

Our new address is: 

2nd Floor 

2 Esh Plaza

Sir Bobby Robson Way

Newcastle Great Park

NE13 9BA

Telephone numbers and email addresses remain the same.  

We look forward to welcoming you all to...

read more
PlanBEE

3e are working in partnership with PlanBEE (Campaign for Change in the Built Environment), who in conjunction with Gateshead College have devised a new way of recruiting and training young people for a career in the construction sector.

A powerful partnership of designers, builders and project managers who operate in the ‘built environment’ have come together to campaign for change to...

read more
Career Opportunity: CAD/Engineering Technician (Infrastructure)

Career Opportunity: CAD/Engineering Technician (Infrastructure)

3e Consulting Engineers are seeking an experienced CAD/Engineering Technician with a professional attitude for an immediate start to join our team within the Newcastle office.

Candidates should be experienced in the use of AutoCAD and preferably hold a HNC/HND in Civil Engineering, CAD or similar subject.

...

read more